Server migration

Server Migration Services for Small Business

Server migration services from Danon Computers move small businesses off aging Windows servers to a new on-site server, a cloud-hosted server, or Microsoft 365. We list every job the old server does, from user accounts and file shares to DNS, DHCP, and applications, then schedule the cutover for an evening or weekend so staff pick up where they left off.

  • Serving Los Angeles
  • Business IT since 1998
  • Remote first, on-site when needed

What a server migration involves

A small business server usually does more than anyone remembers. Before anything moves, we write down every job it handles.

Domain and user accounts

User accounts, groups, and group policy move to a new domain controller or to Microsoft Entra ID. Computers are rejoined in a planned order, so people sign in with the accounts they already know.

File shares and permissions

Shared folders are copied with their permissions intact and mapped to the same drive letters. We compare file counts on both sides before the old shares are switched off.

Business applications

Accounting, practice management, and CAD license servers often need the vendor involved. We coordinate the reinstall, the license transfer, and the database move with each vendor.

The quiet jobs

Scan-to-folder settings, scheduled tasks, printer queues, DNS, and DHCP are easy to miss. Each one is listed and moved, or retired on purpose.

Where your server can go

The right destination depends on your applications, your data, and how your team works.

New on-site server

Current hardware and a supported Windows Server version, sized for growth.

Cloud-hosted server

A virtual machine in the cloud for apps that still need Windows Server.

Files to Microsoft 365

SharePoint and OneDrive replace mapped drives when your apps allow it.

Network updates

DNS, VPN, and firewall rules pointed at the new home of each service.

Backups on both sides

A verified full backup of the old server first, then new backups for the new one.

Security cleanup

Stale accounts removed, admin rights tightened, and old protocols turned off.

Our server migration process

  1. DiscoverWe inventory roles, shares, applications, and every device that depends on the server.
  2. StageThe new system is built and tested next to the old one, with data copied in rounds.
  3. Switch overA final sync, then workstations and apps are pointed at the new system and checked.
  4. Clean upDocumentation is updated and the old server is retired once nothing still uses it.

Planning around end of support

Windows Server 2012 and 2012 R2 reached the end of standard extended support in October 2023, and Windows Server 2016 reaches the end of extended support on January 12, 2027. See Microsoft’s lifecycle page for Windows Server 2016. Offices still on those versions should plan their next step; separate Extended Security Updates arrangements may apply.

Older all-in-one servers

Some offices still run one box that handles email, files, and sign-ins. We split those jobs apart: email to Microsoft 365, files to a new share or SharePoint, and sign-ins to a current domain.

Testing with real users first

A few staff members work on the new system before everyone else. They open the key applications, print, scan, and confirm their files are where they expect.

A fallback for the old server

The old server stays intact and switched off for a while after the move. If something was missed, it can be brought back while we fix the gap, and its drives are wiped or destroyed when it is retired.

What’s included in a server migration

Every server migration we run includes these deliverables, whatever the destination.

  • An inventory of every role on the old server: Active Directory, DNS, DHCP, file shares, print queues, scheduled tasks, and business applications
  • A written migration plan with the cutover date, the order of each step, and how to roll back
  • The new server, cloud-hosted server, or Microsoft 365 setup built and tested next to the old one
  • File shares copied in rounds, with folder permissions and mapped drive letters kept the same
  • User accounts, groups, and group policy moved to a new domain controller or to Microsoft Entra ID
  • Coordination with the vendors of your accounting, practice management, or CAD software
  • A verified full backup of the old server before cutover, and new backups running on the new system
  • Updated network records: IP addresses, DNS entries, and the firewall and VPN rules that point to the new system
  • The old server kept intact for a fallback period, then wiped or its drives destroyed when it is retired

What happens on cutover day

The switch itself is short and scheduled, so the office sees minimal downtime.

  1. Final syncAfter staff sign off for the evening or weekend, the last changes are copied to the new system.
  2. Point services to the new systemDNS, DHCP, mapped drives, and printers are switched over, and the old shares are set to read-only.
  3. Test with real usersA few staff members sign in, open key applications, print, scan, and confirm their files are where they expect.
  4. First working dayWe check in with the office, fix anything that was missed, and answer questions.
  5. Fallback windowThe old server stays switched off but intact until everyone agrees nothing still depends on it.

Signs it is time to migrate

  • The server runs Windows Server 2012 or 2016, which are at or near the end of extended support
  • The hardware is out of warranty, or the drives are reporting errors
  • One machine still handles email, files, and sign-ins at the same time
  • Backups fail, run slowly, or have never been test-restored
  • Staff work remotely and need files without a slow VPN connection
  • Nobody has current notes on what the server does

Server migration FAQ

Will staff need new passwords after the migration?

Usually not. When accounts move within Active Directory, passwords and group memberships come across. A move to Microsoft Entra ID may need one sign-in reset, which we schedule with you.

Can our accounting software move with the server?

In most cases, yes. We work with the software vendor on the reinstall, licensing, and data transfer. QuickBooks Desktop has its own checklist; see our QuickBooks migration service.

Do we have to keep a server at all?

Not always. If your applications run in the cloud, files and sign-ins can leave the office entirely. If one application still needs Windows Server, a small on-site or cloud-hosted server can stay for that job alone.

What if something breaks after the switch?

The old server is kept intact during a fallback period, so we can roll a service back while we fix the problem.

Is Windows Server 2016 still safe to run?

Standard extended support ends on January 12, 2027. Separate Extended Security Updates arrangements may apply after that date. Plan a supported migration path rather than leaving the server unpatched.

How long does a server migration take?

Planning and staging take days to weeks, depending on how much data and how many applications are involved. Most copying happens in the background while staff keep working, and the cutover itself is scheduled for an evening or weekend.

Will mapped drives and printers still work after the move?

Yes. We keep the same drive letters and share names where possible, and update printers and scan-to-folder settings during the cutover. Test users check them before everyone else signs in.

Can you move our file server to SharePoint and OneDrive instead of a new server?

Often, yes. If your applications do not need a Windows file share, files can move to SharePoint and OneDrive with the same folder permissions. See our cloud migration services for that path.

Do you migrate servers for offices outside Los Angeles?

Yes. We plan and stage migrations remotely, and visit on-site in Los Angeles, the San Fernando Valley, Ventura County, and Orange County when hardware needs hands.

Related services

Server support and replacement

Care for the server you keep.

Cloud migration services

Move files and email to the cloud.

QuickBooks migration

Move the company file safely.

Backup and disaster recovery

Recovery for the new system.

Plan your server migration

A server review shows what the old machine runs and the cleanest path off it.

Prefer to reach us directly? Call or text our office or email our team.

On-site and remote IT since 1998.

Schedule an IT assessment